Project Solar energy by Dooren Hillegom
From May 1, 2015, the Van Dooren buildings behind the Water Tower in Hillegom will become 100% CO2 neutral thanks to the installation of 1,008 solar panels that will generate ¼ megawatt of energy.
Van Dooren Transport, Forwarding en Techniek baseline;">2 Neutral!!!
From 1 May 2015, the buildings of Van Dooren, behind the Water Tower in Hillegom 100% CO2 Becoming neutral by installing 1008 solar panels that will generate ¼ megawatts of energy. The buildings that house Van Dooren Transport, Van Dooren Forwarding, and Van Dooren Techniek will be 100% self-supporting in terms of electricity. The offices are heated and cooled by electric heating/air conditioning and therefore do not run on gas. This investment also means that all forklifts, electric ride-on trucks, and electric pallet jacks used in the trucks will be charged with solar energy. Our customers' shipments are therefore truly 100% CO2 Neutrically stored and transhipped, loaded and unloaded.
Electric trucks
“We have chosen to invest heavily in power production. This is because we only see the need for electricity growing in the future. Increasingly heavy shipments and maintaining good staff health require more electric pallet jacks that need to be charged every day. And we see battery quality improving and battery costs decreasing in the foreseeable future. It will therefore also be interesting to explore the possibilities of using electric trucks for regional work. And that means a cleaner flower bulb region!”, says Alex van Dooren
Maintenance & APK
The truck & trailer technology department will also generate all its energy itself. 100 panels will be installed in the workshop, which will generate plenty of the energy used for maintenance, repairs, and MOTs (periodic vehicle safety inspections) of Van Dooren Transport's fleet. The car wash will also be electrically powered, making washing the fleet even cleaner.
Expirion
The business plan has been developed in collaboration with Expirion - Experts in Solar - from Hillegom and the installation will also be carried out by these specialists. This project has been made possible in part by a generous SDE government subsidy. More information?